MicroNet SP9121 Manual Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 184
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
2 Planning the Project TAC Xenta Server – Gateway, Technical Manual
22 (184) Schneider Electric Buildings AB, June 2011
04-00124-06-en
2.4 Understanding the Example System
We are going to create a system for a fictitious company, ACME Inc.,
which has one office bulding as illustrated in Fig. 2.2. The building is a
typical, small two-storey office building, served by packaged roof-top
equipment. The first floor area serves the Entrance Lobby, Accounts,
Marketing, and Senior Management. The second floor area serves Cus-
tomer Support and Engineering.
Fig. 2.2: The ACME building.
Engineering
Support
Lobby
Accounts
Conference Room
Marketing and Management
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 183 184

Comments to this Manuals

No comments